Description

 

The refurbishment of a Grade II listed Jacobethan style 1889 Town Hall in Trowbridge. In 1973, the building was converted into a Magistrates' Court, which resulted in many of the larger rooms being divided in smaller cellular spaces. The works involve removing many of the 1970s interventions, and restoring the building to its former glory, particularly the Great Hall room, which will be used for live music events. I was involved in developing the project from Stage 2, producing a comprehensive Stage 3 & 4 drawing set and planning / LBC package. The project has now on site, with Beard as the main contractor

Site Photos

Roles & Responsibilities: Project Architect

I was the Project Architect role responsible for developing the scheme from RIBA stage 2 to Construction stage.

Stage 3 - Planning

- Developing scheme from Stage 2

- Leading and attending DTMs with design team and client

- Producing drawings and documentation for Planning Application & LBC

- Submitting Stage 3 Report

 

Stage 4 - Tender Documentation

- Developing & Submitting Tender documentation & drawings for contractor pricing

- Coordinating the design with the design team

- Completing documentation for Building Control

- As this was a two stage Tender process, I was involved with developing the scheme with the Main Contractor.

Stage 5 - Site

- Attending DTMs and Site Inspections

- Updating drawings to IRS schedule

- Coordinating sub-contractors drawings